Airport Runway Being Repaved
The Santa Barbara Airport began repaving one of its three runways on 11/12, removing the current surface, filling cracks, and laying down new asphalt along the 4,184-foot airstrip. The $1.74 million project was awarded to Granite Construction, and work is expected to finish by January 2014.