Santa Barbara Airport Attempts to Avoid Drowning
Airport Plans for Effects of Flooding and Sea-Level Rise, Public Invited to Take Part This January
![](https://www.independent.com/wp-content/uploads/2024/12/SBA-flood-2-19-24.jpg)
This past February, the Santa Barbara Airport closed twice due to flooding from incessant rainstorms. The year before it closed in January when powerful storms driven by atmospheric rivers of rain dropped more than 10 inches along the coast and 33 inches in the mountains. Barely 15 feet above sea level — the Pacific Ocean is just a few hundred yards away — the airport is bordered by the Goleta Slough and three creek systems. Given its vulnerability to sea level rise, the airport is currently planning for the effects an increase of up to 6.6 feet, and the public is invited to take part.
The 950 acres that contain the airport are no stranger to flooding. In fact, the neighboring Goleta Slough was born out of a winter that brought Biblical levels of rainfall. What had been a bay deep enough to draft small ships on Christmas Eve in 1861 came to be filled with the gravel and sand that swept from the mountains during a near-continuous rainstorm that lasted until February 5, 1862. Historians called it the Noachian deluge, Larry Gurrola wrote in a report titled “Fire, Flood, and Landslide Dam History” (2022). The storms dropped 50 inches of rain in Santa Barbara, clearing the soil out of the orchards, Gurrola wrote. Flooding from mountain creeks “permanently changed the 36 landscape and creek channel locations of Santa Barbara County.”
This past March, a study of core samples from the Carrizo Plain showed that even larger episodes of flooding had occurred sometime between 1470 and 1640, and again at some point between 1740 and 1800. Though the 1862 floods were large enough to create an inland sea 300 miles long in the Central Valley, the study published in the Journal of Paleolimnology did not find sediment from those floods in the core sample. As reported by the Los Angeles Times in June, this suggested that 1862 was a significantly smaller flood than the other two events.
![](https://i0.wp.com/www.independent.com/wp-content/uploads/2024/12/SBA-and-creeks.jpg?ssl=1)
[Click to expand] A map of Santa Barbara Airport and surrounding creeks from the airport’s sea-level rise adaptation plan. | Credit: Courtesy
The waterways around Santa Barbara Airport have all been altered to reduce flood risks, but the pooling of water on the runways has shut the airport periodically since it started commercial flights in 1936, most severely in 1969 and 1995, when the entire airport flooded, not just the runways. The Climate Change Vulnerability Assessment prepared by the airport underlines the effects of climate change in causing three closures in the past two years.
The stakes are high. Any day-long closure affects 21 to 34 flights and costs the airport around $120,000 in revenue a day. Add to that any damage or debris; for late February 2024, that totaled $879,000. If 2.5 to 3.3 feet of ocean rise occurs, the report envisions the costs from flooding would cause operations to cease as early as 2068, or as late as 2108.
In preparation for the upcoming review, the airport’s Climate Change Vulnerability Assessment is part one of a three-phase endeavor to analyze the area, airport operations, and flood protection, and come up with a plan by 2026. It also looks at Isla Vista and Old Town Goleta and the effects of flooding there, on airport equipment, sewers, storm drains, and more.
The next section of the study would examine methods to protect the airport against flooding, accommodate floods, or implement retreat strategies that allow the airport to keep functioning. The range of strategies go from “nature based” to “hard-grey” structures, and the next phase includes costs and points at which action must be taken. The final phase is an update of city ordinances and plans to reflect the outcomes of the Climate Adaptation Plan, which is linked at this page.
An open house for the Climate Adaptation Plan takes place on Tuesday, January 7, 2025, 6-7:30 p.m., at Direct Relief (6100 Wallace Becknell Rd.). The city Airport Commission takes up the topic on Wednesday, January 15, 2025, 6 p.m., at the Airport Administration Office (601 Firestone Rd.) Comment can also be submitted by email before January 16, 2025, at SBA_CAP@SantaBarbaraCA.gov.
Premier Events
Mon, Jan 13
6:30 PM
Santa Barbara
Science Pub: “Less Charismatic” Animals
Tue, Jan 14
7:00 PM
Santa Barbara
Lucinda Lane Album-Release Show, at SOhO
Tue, Jan 14
7:30 PM
Santa Barbara
UCSB Arts & Lectures Presents: An Evening with Esther Perel
Wed, Jan 15
5:00 PM
Santa Barbara
Public Meeting Commenting on VSFB SpaceX Launches
Wed, Jan 15
5:30 PM
SANTA BARBARA
California Avocados: A Delicious History
Thu, Jan 16
7:00 PM
Santa Barbara
Panic!: CBS and the 1950s Blacklist
Fri, Jan 17
7:00 PM
Santa Barbara
Baroque: Emergence
Fri, Jan 17
7:00 PM
Santa Barbara
Laguna Blanca Theatre Proudly Presents “Clue”
Fri, Jan 17
7:30 PM
Santa Barbara
Selah Dance Collective to Present “Palermo!”
Sat, Jan 18
10:00 AM
Carpineria
People’s March – Carpinteria
Mon, Jan 13 6:30 PM
Santa Barbara
Science Pub: “Less Charismatic” Animals
Tue, Jan 14 7:00 PM
Santa Barbara
Lucinda Lane Album-Release Show, at SOhO
Tue, Jan 14 7:30 PM
Santa Barbara
UCSB Arts & Lectures Presents: An Evening with Esther Perel
Wed, Jan 15 5:00 PM
Santa Barbara
Public Meeting Commenting on VSFB SpaceX Launches
Wed, Jan 15 5:30 PM
SANTA BARBARA
California Avocados: A Delicious History
Thu, Jan 16 7:00 PM
Santa Barbara
Panic!: CBS and the 1950s Blacklist
Fri, Jan 17 7:00 PM
Santa Barbara
Baroque: Emergence
Fri, Jan 17 7:00 PM
Santa Barbara
Laguna Blanca Theatre Proudly Presents “Clue”
Fri, Jan 17 7:30 PM
Santa Barbara
Selah Dance Collective to Present “Palermo!”
Sat, Jan 18 10:00 AM
Carpineria
You must be logged in to post a comment.